by babul » Tue Jun 28, 2011 3:13 pm
Also using this community and we should go together to BPTP office.I have alraedy mailed them the following letter.
Dear Sir/Madam,
I am in receipt of a SMS as well as a mail stating that outstanding due amount of Rs. 4, 64,805.88/= needs to be paid on account of increase in super built up area. Below mentioned are some points that I want to bring to your notice.
1. Your letter speaks that on measuring the dimension of unit of BPTP park Elite floor of unit No ----,super area of the unit stands revised to 1411 instead of 1203 square feet.
2. As you are aware that I have already made payment of 85% as per the demand raised by you till date which approximately tantamount to 21 lacs.85% payment means that you must have done construction up to brick work of my floor. Construction of floor must have started at the time when CLP corresponding to 45% were raised which was done approximately one year back .Now how come the super built up area revised overnight of its own when the construction in progress is going since last one year? It smells that the plan was cooking in the mind of BPTP Management long time back.
3. Literal meaning of your letter is that you have measured the dimensions today and found that erroneously super built up area of the flat become 1411 sq feet which was supposed to be 1203 sq feet that means you or your designated site engineers have not measured the dimensions at the time columns and beams of first floor were being casted which is sheer negligence on your part. In lieu of asking for further payment you should be penalised for not meeting the agreed dimensions.
4. Revision of built up area means that either you have revised some dimensions of carpet area or you have strengthened the building by increasing size of column. It is humorous to mention that you have asked for payment without even submitting the revised drawing of flat.
5. Super built area has been defined clearly in NATIONAL BUILDING CODE 2005 which every builder or owner has to abide by being India a democratic country. No such definition has been laid in your Agreement Paper.
6. More over there is no assurance as on date that you may not repeat such type of heinous conspiracy in future. Today you are saying on measuring the super built up was found 1411sq feet, later you may claim it 14000 sq feet for the same flat. There must be limit to any thing.
7. It is worth while mention that at the time of advertisement in approximately two year back, cost of flat was advertised @ Rs.23.76 lacs (Rs. 22.37lacs for BSP and Rs 1.39 lacs for EDC and IDC) which now stand @ Rs. 29 lacs approximately (Adding revised super area charges and Club charges).Already it has exceeded 20% of original booking and what holds in future, is not clear.
8. Based on advertisement, reputation of BPTP and my monetary condition, I had planned for BPTP Park Elite Floor. Also, at the time of booking the project was looking cost effective but now it has become expensive in comparison of projects of other builders. Moreover I am not in position to pay the excess amount asked by BPTP. Dreams of owning a flat has really shattered. Surely, it is a breach of trust and it has exposed true colours of BPTP. And it seems the company does not have any moral values.
9. Time limit for the payment has been set to 20 days. It looks like you are asking ransom money for the crime I committed by booking a flat in Park Elite floors. I cannot imagine what type of company it is. This type of fraud cannot be tolerated.
10. Also, how come flat of 250 sq yards can have different Super built up as I can see you have written 1411 for some 250 sq yard flat 1403 for some 1380 for rest. Is there any standardisation in your company or not?
As presented above, we as a group of people (Say Sufferer now connected through networking sites) want to come and discuss with management of BPTP or some of their representative for any recourse.
In view of that please fix any appointment on coming Saturday such that we can sort out any outcome of the dissension. Also you are requested to send the revised drawing through mail such that we can check where super built up area has been revised.
We seek an early reply or else we will move to consumer court.
Thanking you,
Prabhat Kumar