by ravee » Mon Jul 07, 2014 3:02 pm
Even I have received offer for possession from Omaxe (New Heights). They have included enhanced EDC. Even PLC has been increased without any basis. I visited my flat in Bloomberg last saturday and found that:
1. The swimming pool, the club and other common amenities are far from nearing completion.
2. Inside the flat I found that:
a. The paint job is incomplete.
b. Electrical wiring is still in progress and no electrical fittings were fixed.
c. Ceilings in both the bath rooms were not fixed.
d. No bathroom fittings including the W/C were in place.
e. All windows bore patches of cement all over.
f. Window railings were full of cement.
g. Doors were not fixed properly and were causing marks on the tiles.
h. Many of the floor tiles were not fixed properly making the floor uneven.
i. A huge crack showed in the wall inside the drawing room which is cause of grave concern and should be investigated to its cause and fixed properly.
j. No fittings were found in the kitchen either.
A layman will be able to make a wild guess that the complex and the flat is not in a livable condition and cannot be offered for possession right now , going by the pace of the work. Under the circumstances the demand of the company just before one day before the completion of 3 years of the signing of the contract is nothing but only to show that it had offered the possession well within the stipulated period of 3 years.